The weekend is here! Despite all the recent rainfall, we’ve been able to take advantage of the clear weather window and successfully pour concrete valley pans throughout the site. Our next phase will involve the pouring of asphalt for the main road and driveways. We will continue with road prep early next week and will look to begin asphalt pour at the tail end of the week.
Building 1: Final paint continues at unit 2. After asphalt is poured and cured we will look to begin staining the exterior siding. Plumbers are currently purging the boiler and radiant heat lines. Boilers will be fired up at building one soon.
Building 2: Carpenters have begun setting doors and installing window sills at unit 4. They will continue with their trim work over the next few weeks.
Building 3: All rough inspections are passed. Framing inspections are called for early next week.
Building 4: Rough plumbing has wrapped up at building 4. Electricians are prepped and ready to start running wire at unit 10.
Building 5: Rough plumbing has begun at unit 13. They will continue their rough-in over the next few weeks at building 5.
Building 6: Drywall work is wrapped up at unit 17 and painters are prepping for their initial priming of walls and ceilings. Unit 18 drywall is hung and currently being taped and mudded.
Have a great weekend everyone!