News

Buyer’s Update – March 17th, 2023

March 17, 2023 by Fish Hawk Landing

Units going up fast

Building 1: Carpenters continue their trim work and hanging doors. Metal roofing and shingles have been installed.

Building 2: Unit 6 drywall has been taped, mudded, and textured. Painters are currently prepping for priming walls and ceilings. Drywall is stocked and his begun being hung at unit 5.

Building 3: Rough electrical continues at unit 9. In-floor radiant heat lines have been installed and gypcrete has been poured at all three units. Insulation will be next up for building 3.

Building 4: Timber framing is on-going. Soffit continues to be installed and windows continue to go in.

Building 5: Roof framing is finished and framing back-out is currently in progress. We will look to start backfilling the foundation soon, followed by insulating, and running in-slab radiant heat lines. After that we will pour the slab. Another reminder that second additional deposits will be due at slab pour.

Building 6: Gypcrete is poured and insulation has begun at unit 16. After completed they will move to unit 17 and finished at unit 18. Drywall will follow soon after insulation is all wrapped up.

Have a great weekend gang!

Great room ready for flooring
Drywall going up 2
Siding going up
Great room framed
Windows installed

Filed Under: Fish Hawk Landing News

Buyer’s Update – March 10th, 2023

March 10, 2023 by Fish Hawk Landing

Drywall going up

Another productive week in the books down here at FHL! Here’s our weekly update:

Building 1: Carpenters are currently setting doors and installing window sill trim. After completed they will begin installing baseboard and door casing. Shingle install continues. Boiler work will begin soon.

Building 2: Drywall has been hung at unit 6, drywallers are currently taping and mudding. They will spend next week texturing then painters will come in and begin priming the finished walls and ceilings. Drywall will be stocked soon at unit 5. 

Building 3: Rough electrical has wrapped up at unit 8 and is currently on-going at unit 9. In-floor radiant heat lines will go in next week and gypcrete pour will follow soon thereafter.

Building 4: Deck framing and timber framing continues. Installation of soffit in the front entryway is currently on-going.

Building 5: Framing on upper level walls has wrapped up, trusses have been installed, sheathing is being hung, and roof framing will be wrapped up soon.

Building 6: Gypcrete pour has now finished at all three units. Insulation will be next up.

Enjoy a fun eventful weekend everyone!

Custom shower tile
Drywall going up 1
Dark cabinets in kitchen
Entry way getting framed
Framing going up

Filed Under: Fish Hawk Landing News

Buyer’s Update – March 3rd, 2023

March 3, 2023 by Fish Hawk Landing

Kitchen Light Finish

Friday is here! Hope you all had a great week! Here is our weekly update:

Building 1: With the kitchen backsplash tile now completed at all three units, tile work has wrapped up at building 1. Carpenters will continue trimming out the units over the next couple weeks. Shingle install is currently on-going. 

Building 2: Drywall has been stocked at unit 6. Drywallers will begin hanging drywall next week.

Building 3: Rough plumbing continues at unit 9 and should be wrapped up sometime next week. Rough electrical is on-going at unit 8.

Building 4: Almost all windows are installed and Tyvek housewrap is up. Deck framing and timber framing will continue into next week.

Building 5: Main level walls have been framed, upper level joists are rolled, and framing on the upper level walls has begun. 

Building 6: In-floor heat lines have been installed and gypcrete has been poured on the upper and main levels at units 16 and 17. Gypcrete pour will wrap up at unit 18 next week.

Have a great weekend everyone!

Bathroom custom tile
Garages going in
exterior framing
Insulation installed

Filed Under: Fish Hawk Landing News

Buyer’s Update – February 24th, 2023

February 24, 2023 by Fish Hawk Landing

Bathroom ready for finishes

Happy Friday everyone! Here is our weekly update:

Building 1: Tile work has begun on kitchen backsplashes and will continue into next week. Carpenters have started installing trim beginning with the window sill. Doors are also currently being set. Almost all countertops have been installed and we will be looking to begin electrical & plumbing trim out soon.

Building 2: Insulation is completed at all three units. We will begin stocking drywall next week at unit 6.

Building 3: Rough plumbing is wrapping up at unit 9. Rough electrical has finished at unit 7 and is currently underway at unit 8.

Building 4: The dry-in process continues with windows currently being installed and Tyvek housewrap going up. Small framing adjustments are still in progress.

Building 5: Framing of lower level walls have finished. Main level floor is finished and walls are currently in progress.

Building 6: In-floor radiant heat lines are currently being installed. After completed we will look to pour gypcrete on the main level and upper level at all three units.

Have a good weekend gang!

Dark kitchen motif 1
Doorway
Ready for insulation
Almost dried in
Going up

Filed Under: Fish Hawk Landing News

Buyer’s Update – February 18th, 2022

February 18, 2023 by Fish Hawk Landing

Dark kitchen motif

Happy weekend Fish Hawk family! Here is our weekly update:

Building 1: Tile work on all bathrooms and fireplaces has wrapped up at building 1. Carpenters have finished setting cabinets in all three units and countertops have been templated and will be installed soon. Luxury vinyl plank flooring on the main level and upper level is installed, all that remains for LVP flooring is the lower level.

Building 2: Gypcrete on the main level and upper level has been poured at all three units. Insulation is nearly completed at the final unit and we will begin stocking drywall soon.

Building 3: Rough plumbing continues at unit 9. Rough electrical is on-going at unit 7 and will move to unit 8 once wrapped up.

Building 4: Roof framing has wrapped up and framers are currently working on their framing back-out. Windows are currently being installed and Tyvek housewrap is going up.

Building 5: Framing of the first floor has begun. After first floor framing is finished we will insulate the slab, run in slab-heat lines, and pour the slab. Another reminder that second additional deposits will be due at slab pour.

Building 6: Rough electrical has wrapped up at building 6. Gypcrete pour and insulation install will be next up.

Enjoy a nice relaxing weekend everyone!

Kitchen roughed in
Fireplace tile
Shower tile
A beatiful winter day
Unit going up

Filed Under: Fish Hawk Landing News

Buyer’s Update – February 3rd, 2023

February 3, 2023 by Fish Hawk Landing

A beautiful winter day for framing

Hope y’all had a great week. Here is our weekly update:

Building 1: Tile work has wrapped up at units 1 & 2 and is currently in-progress at unit 3. Carpenters have begun hanging cabinets at unit 1, once completed they will move to unit 2. Installation of Luxury Vinyl Plank flooring will begin soon.

Building 2: Two units have passed framing inspection and after a few framing corrections at the third unit we will have all three ready for insulation. In the meantime insulation has begun at unit 4 and will move to the next unit soon.

Building 3: Rough plumbing is wrapping up at unit 7. Rough electrical will begin here once it is wrapped up at building 6.

Building 4: Trusses are in and we’ve begun roof framing. Exterior drywall has begun to go up.

Building 5: Framing of the first floor will begin soon. After framing has wrapped up we’ll insulate the slab, run heat lines, and pour the slab.

Building 6: Rough electrical has begun at unit 18. After electrical is wrapped up we will begin insulating at unit 16.

Have a great weekend everyone!

Custom Shower
Custom Deck
Insulation
Kitchen Cabinets going in